翻訳と辞書
Words near each other
・ USS Fillmore (APA-83)
・ USS Finback
・ USS Finback (SS-230)
・ USS Finback (SSN-670)
・ USS Estelle (SP-747)
・ USS Estero
・ USS Estero (AG-134)
・ USS Estes (AGC-12)
・ USS Estocin (FFG-15)
・ USS Estrella (1862)
・ USS Etamin (AK-93)
・ USS Ethan Allen
・ USS Ethan Allen (1859)
・ USS Ethan Allen (SSBN-608)
・ USS Etlah
USS Etlah (1864)
・ USS Etlah (AN-79)
・ USS Etta M. Burns (SP-542)
・ USS Eucalyptus (AN-16)
・ USS Eugene
・ USS Eugene (PF-40)
・ USS Eugene A. Greene
・ USS Eugene E. Elmore (DE-686)
・ USS Eugene F. Price (SP-839)
・ USS Eugenie (1862)
・ USS Euhaw (IX-85)
・ USS Euphemia (SP-539)
・ USS Eurana (SP-1594)
・ USS Eureka (1862)
・ USS Europa


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

USS Etlah (1864) : ウィキペディア英語版
USS Etlah (1864)

USS ''Etlah'', a single-turreted, twin-screw monitor, was still under construction at St. Louis, Missouri, at the close of the American Civil War. A ''Casco''-class, light-draft monitor, she was intended for service in the shallow bays, rivers, and inlets of the Confederacy. These warships sacrificed armor plate for a shallow draft and were fitted with a ballast compartment designed to lower them in the water during battle.
Though the original designs for the ''Casco''-class monitors were drawn by John Ericsson, the final revision was created by Chief Engineer Alban B. Simers following Rear Admiral Samuel F. Du Pont's failed bombardment of Fort Sumter in 1863. By the time that the plans were put before the Monitor Board in New York, NY, Ericsson and Simers had a poor relationship and Chief of the Bureau of Construction and Repair John Lenthall had little connection to the board. This resulted in the plans being approved and 20 vessels ordered without serious scrutiny of the new design. $14 million US was allocated for the construction of these vessels. It was discovered that Simers had failed to compensate for the armor his revisions added to the original plan and this resulted in excessive stress on the wooden hull frames and a freeboard of only 3 inches. Simers was removed from the control of the project and Ericsson was called in to undo the damage. He was forced to raise the hulls of the monitors under construction by 22 inches to make them seaworthy.
The entire class was considered a disappointment, and ''Etlah'' was laid up at one or another location until sold 12 September 1874. Between 15 June and 10 August 1869, she bore the name ''Hecate'' while being laid up at Mound City, IL.
== References ==

*


抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「USS Etlah (1864)」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.